How long did the Pittston window film installation take?
The entire installation across all four buildings — primary, intermediate, middle, and high school — was completed in under one week. The COVID-19 closures allowed the installer, Sun Control Plus, to work in empty buildings and move quickly through all locations.
Technical Context & Implementation
For large-scale commercial facilities, the implementation of this solution requires a systematic approach. Facility managers must consider the building envelope as a single thermal unit. When addressing how long did the pittston window film installation take, our verified installation partners utilize manufacturer-grade software to perform dynamic simulations.
This ensures that any retrofit—whether it be solar control, security laminate, or decorative privacy film—meets local building codes and maintains the structural integrity of the existing glazing system.
Key Performance Indicators (KPIs)
- Total Solar Energy Rejection (TSER)
- Visible Light Transmission (VLT)
- Infrared Rejection (IRR)
- U-Value (Insulative Performance)
Get the ROI Whitepaper for Facility Managers
Learn how architectural window film reduces HVAC lifecycle costs and improves building ESG ratings. Includes 2026 cost-per-sqft data.
Verified by 1,200+ Facility Managers